Connect to ALFA
A training aircraft with flight personnel

01 / AVIATION

The sky is
just the beginning.

Aircraft. Training. Technical expertise. Aviation is the first chapter of the ALFA ecosystem.

Explore the story ↓
18Aviation assets in Vman’s reported owned-and-managed portfolio
20Electric training aircraft in West Rift’s non-binding LOI
105Training aircraft in the proposed leasing pipeline

WHAT WE HAVE TO BUILD ON

Aviation expertise.
Real operating context.

The aviation strategy starts with experienced organisations: Al Furqan’s financing and structuring background, Vman’s asset-management capability, and West Rift Aviation’s electric training-aircraft programme.

The Furqan–Vman profile documents a partnership covering aviation consultancy, airports, leasing and financing. That relationship gives the aviation chapter a specific institutional foundation.

An H160 helicopter in flight

AIRCRAFT & TECHNICAL CAPABILITY

An asset platform
with range.

Vman’s company materials report a portfolio of 18 owned and managed aviation assets. The portfolio spans helicopters, training aircraft, regional and cargo aircraft, and simulator capability.

Fleet diversity

H125 helicopters, Piper Archers, Diamond DA42s, ATR72 and B737F aircraft appear in the portfolio materials.

Training infrastructure

An A320 simulator extends the platform’s training and proficiency capabilities.

Vman portfolio figures, as reported in its company profile.

WHAT HAS BEEN ACHIEVED

Built on years of
aviation experience.

A documented partnership

The Al Furqan–Vman profile sets out the aviation partnership and its consulting, financing and leasing remit.

An established asset platform

Vman IFSC was established in 2021. The materials describe an 18-asset owned-and-managed portfolio.

An experienced team

The Vman profile attributes more than 100 years of combined aviation experience to its team.

A signed training-aircraft LOI

West Rift Aviation signed a non-binding letter of intent on 20 January 2026 for 20 Volar RX4E electric training aircraft.

Achievements are attributed to the named organisations. West Rift’s LOI is non-binding; aircraft acquisition and ALFA service integration remain separate execution steps.

Illustration of trainee pilots preparing for flight, with no institutional affiliation

A NEW GENERATION OF AVIATORS

Talent needs
a place to take flight.

The ambition connects aircraft availability with training quality, regional access and the infrastructure that helps pilots progress.

Pilot training in a flight simulator

WEST RIFT AVIATION

Electric training.
The next chapter.

West Rift Aviation Ltd, a flight-training organisation based at Wilson Airport in Nairobi, has signed a non-binding letter of intent for 20 Volar RX4E electric training aircraft. The proposal supports pilot training, fleet modernisation and sustainable aviation technology.

20Aircraft in the LOI
5 / yearProposed delivery rate
20 Jan 2026Letter of intent signed

The letter proposes phased deliveries of five aircraft per year, with Al Furqan Financing assisting with long-term financial structuring. Technical specifications, commercial terms and regulatory approvals will shape the programme’s next steps.

The LOI is non-binding and subject to agreed terms, regulatory approvals and definitive contracts.

THE NEXT PLATFORM

105 aircraft.
A focused ambition.

The proposed training-aircraft platform outlines 105 aircraft, an indicative US$53 million fleet programme and a seven-year framework. The objective is to support flight-training capacity through a structured leasing model.

Separate H145 and H160 materials describe specific helicopter leasing opportunities. Each opportunity requires its own technical diligence, ownership verification, lessee review, insurance and transaction documentation.

105Proposed training aircraft
US$53MIndicative training-fleet programme
7 yearsFramework described in the proposal
Aviation engineers working in an aircraft hangar

FROM AIRFRAME TO SERVICE

More than an aircraft.
A complete capability.

Aircraft availability is only one part of a dependable aviation service. Technical records, continuing airworthiness, maintenance capacity, trained crews and disciplined asset management determine whether a fleet can perform.

The ecosystem vision combines leasing and financing with pilot training, simulation, technical services and, over time, medical and electric aviation opportunities.

Discover the medical aviation story

WHERE WE’RE HEADED

From opportunity
to operational delivery.

A sequence of delivery milestones. Timing depends on project readiness, agreements and approvals.

01

Validate each asset

Complete technical records, title, valuation, operator and lease diligence for each opportunity.

02

Structure the platform

Agree the asset-holding, financing and operator arrangements; finalise each delivery agreement separately.

03

Expand training capacity

Phase aircraft availability, instructor resources, maintenance and simulation into the training programme.

04

Connect ecosystem services

Develop eligible digital services, medical aviation partnerships and future electric-aviation opportunities.

Sources, ownership & project status +

Sources: Furqan–Vman partnership profile; Vman helicopter, H145 and H160 presentations; West Rift Aviation’s signed letter of intent dated 20 January 2026; 105-aircraft leasing-platform proposal. Operator portfolio counts are reported. West Rift’s LOI is non-binding; leasing opportunities and fleet expansion are not represented as completed ALFA transactions.

Explore the source notes

KEEP EXPLORING

One ecosystem.
A wider perspective.

↑

PARTNERSHIPS ENQUIRIES

Expertise belongs here.

Connect with ALFA about operating partnerships, project development and specialist capabilities.

partnerships@GetALFA.io