Productive assets
Aircraft, land, facilities, energy systems and mineral projects.

RESEARCH & PROJECT INTELLIGENCE
The organisations, project studies and industry connections behind the ALFA ecosystem.
Explore ↓THE PROJECT LANDSCAPE
Aviation, productive land, food processing, energy and mineral development share a need for capable operators, reliable infrastructure and access to markets. ALFA brings these connected opportunities into one ecosystem.
Explore the project landscape, then open the source register for the detail behind the programme.
105Aircraft in the proposed training platformAVIATION / INDIA & EAST AFRICA
45Centre pivots in the Mwenezi designAGRICULTURE / ZIMBABWE
RICE PROCESSING / SENEGAL
ENERGY / KENYA
2Countries · Mineral projects in Zambia and ZimbabweMINING & NATURAL RESOURCES / SOUTHERN AFRICA
THE CONNECTION BETWEEN INDUSTRIES
Aircraft, land, facilities, energy systems and mineral projects.
Technical teams, sponsors and specialist partners.
Services, processing, logistics and distribution.
THE SOURCE REGISTER
13 source groups
The core ecosystem vision, proposed BSC utility token, one-billion supply and ALFA Debit concept.
The current product brief establishes the direction of the ecosystem. Contract deployment, final allocations and card-programme arrangements are subsequent development milestones.
Institutional experience and the documented aviation relationship.
The profile reports more than US$3 billion in executed Al Furqan transactions, activity in 35+ countries and 100+ clients. A separate US$4 billion deals-facilitated metric measures a different activity and is not added to executed transactions.
Aircraft, training institutions and proposed transactions.
Vman, H145, H160, Modair, Aero City and Aerosphere presentations describe operating capabilities and aviation opportunities. The 105-aircraft proposal outlines an indicative US$53 million programme. West Rift’s electric training-aircraft letter of intent is recorded separately below. Individual transactions require separate diligence and closing.
Stella Mundi / final draft / 25 August 2026.
The study describes a 4,250-hectare holding, 2,200-hectare irrigated lucerne design and 45 pivots. It records completed sponsor diligence, technical validation and stakeholder engagement ahead of lender appraisal. Planned production and financial forecasts are project assumptions.
A 5,000-hectare, three-year plantation and processing programme.
Establishment is proposed in increments of 1,000, 1,500 and 2,500 hectares. The project connects cultivation with processing and biomass potential. Revenue figures vary between the presentation summary and financial model; they are excluded from ALFA’s headline metrics.
A 5,000-hectare feedstock-to-biomethane proposal.
The concept describes cultivation, harvesting, digestion, cleaning, upgrading and compression, with feasibility, pilot, scale and verification stages. Feedstock, technology, offtake and financing remain project-development priorities.
A proposed 7 TPH rice mill in the Senegal River Valley / July 2026.
Maktoum Group proposes a partnership with Sarveshwar Foods Ltd. for a turnkey rice mill in the Saint-Louis region. The July 2026 proposal models 33,600 tonnes of annual paddy input and approximately 20,800 tonnes of white rice. Proposed investment is €7.3 million: €5.5 million for the plant and erection, plus €1.8 million of working capital. HP Handling of Italy is named for the processing line. Partnership terms and financing remain subject to due diligence.
Signed 20 January 2026 / 20 Volar RX4E electric training aircraft.
West Rift Aviation Ltd’s non-binding letter of intent outlines the proposed acquisition of 20 Volar RX4E electric training aircraft, phased at five aircraft per year. Al Furqan Financing is to assist with long-term financial structuring. The proposal remains subject to commercial terms, technical specifications, regulatory approvals and definitive agreements.
Botha Resources / Zambia / Version 6, August 2026.
The profile describes the 396.78-hectare Kamiyobo project in Mumbwa District and small-scale mining licence 7537-HQ-SML. The licence transfer to Botha Resources was documented on 24 June 2026. Existing pit development, site infrastructure and a technical archive support the next phase of representative sampling, drilling, geological modelling and metallurgical testwork. The profile does not declare a Mineral Resource or Reserve.
Corporate and technical project profile, pp. 5, 9–11, 14–15, 28–31 and 37–38.
Explore Mining & Natural ResourcesSialumba concession / Southern Province, Zambia / lithium, tin and critical minerals.
The 41.67-square-kilometre concession holds large-scale mining licence 41481-HQ-LML, commencing in September 2025 for a 25-year term. The materials include ZEMA’s 5 June 2025 environmental approval with conditions, geological surveys and drilling beyond 120 metres. Bench-scale graphite testing reported 95.64% fixed-carbon concentrate at 91.3% recovery. Resource-upgrade drilling, pre-feasibility studies and processing testwork remain development priorities.
Srimaan Resources project profile, pp. 5, 8, 10, 73, 87 and 99–100. Laboratory results are testwork outcomes, not commercial plant performance.
Explore Mining & Natural ResourcesSuvarna Mineral Resources / Zimbabwe / technical report dated 8 August 2025.
The materials describe a 1,911-hectare gold exploration and development project in Zimbabwe’s Midlands Province. Drone mapping, aeromagnetic interpretation, surface sampling and 22 resistivity/IP survey lines extending approximately 29 kilometres provide a basis for follow-up drilling. Processing remains conceptual; resource classification, recovery testing, feasibility work and approvals are subsequent project gates.
1,911-hectare technical report, pp. 1 and 4–6, 11–13; Shangani investment teaser and executive summary. Estimates presented on different bases are not combined into a reserve or project valuation.
Explore Mining & Natural ResourcesMatabeleland South, Zimbabwe / April 2025 / proposed exploration programme.
An April 2025 memorandum between Mining Promotion Corporation and Suvarna Mineral Resources outlines a proposed gold programme over approximately 500 hectares at Prince Brutus. This is a separate project from the 1,911-hectare Shangani area. The contemplated joint venture remains conditional on due diligence, definitive arrangements and approvals; the memorandum does not establish production or an ALFA ownership interest.
Prince Brutus memorandum, supplied within the 20-page evaluation attachment, pp. 2–3, 11, 13 and 19–20.
Explore Mining & Natural ResourcesBikita District, Zimbabwe / field campaign, 31 May–3 June 2025.
The draft technical report describes a 1,640-hectare exploration area and 28 kilometres of resistivity and induced-polarization profiling across 40 survey profiles. A separate June 2025 summary reports follow-up sampling and preliminary drilling. The next programme centres on systematic drilling, laboratory assays, metallurgical testing and an independently reviewed resource model. Differing geological estimates in the supplied documents are not presented as verified reserves.
A2 draft lithium report, pp. 3–5, 7–8 and 29; June 2025 technical summary, pp. 1–4.
Explore Mining & Natural ResourcesNo matching materials. Try a different project or sector.
INDUSTRY CONTEXT
Network documentation for the proposed ALFA blockchain.
Explore BNB ChainPayment-network context for the intended ALFA Debit programme.
Explore Visa solutionsAircraft capabilities across medical, passenger and specialist missions.
Explore the H145Industry references provide technical context; they do not establish an ALFA commercial agreement or endorsement.
INVESTORS ENQUIRIES
Contact the team about project materials and institutional due diligence.