Connect to ALFA
Cinematic illustration of mineral-rich geological strata in a Southern African landscape

MINING & NATURAL RESOURCES

Deep foundations.
New possibilities.

Copper. Critical minerals. Gold. Lithium.
A new chapter for ALFA in Zambia and Zimbabwe.

Explore the projects ↘

THE FIFTH SECTOR

The materials behind
a changing world.

Mining & Natural Resources extends the ALFA ecosystem into mineral exploration and development. The programme connects projects in Zambia and Zimbabwe with the technical, commercial and financing work needed to advance them.

Each opportunity starts with its own geology, company and mineral rights. Copper and critical minerals sit alongside gold and lithium, with development decisions grounded in project-specific evidence.

2Countries
4Mineral themes
5Named project profiles
Representative 01 / copper / zambia exploration imagery; not a photograph of the named project

01 / COPPER / ZAMBIA

Kamiyobo.
A platform to build on.

396.78 haLicensed area
7537-HQ-SMLMining licence
24 Jun 2026Recorded transfer to Botha

THE PROJECT

Botha Resources Limited’s Kamiyobo Copper Project is located in Mumbwa District, Central Province. The project combines a documented small-scale mining right with an existing pit, access infrastructure and exposed copper mineralisation.

The August 2026 profile establishes a site and technical starting point. Further work will determine grade continuity, recoverability and the practical development plan. Selected sample assays are not presented as the average grade of the deposit.

DOCUMENTED PROGRESS

  • Licence transfer documented in June 2026.
  • Existing pit, camp and site access described in the project profile.
  • Geological records and laboratory test reports available for technical review.
The next phase +
  • Systematic sampling and drilling to define mineralisation.
  • Geological modelling, mine planning and representative processing tests.
  • Confirm operating scope, environmental obligations and development financing.
Representative 02 / critical minerals / zambia exploration imagery; not a photograph of the named project

02 / CRITICAL MINERALS / ZAMBIA

Srimaan Resources.
A wider mineral horizon.

41.67 km²Concession area
25 yearsMining-licence term from September 2025
120 m+Reported diamond-drilling depths

THE PROJECT

Srimaan Resources is advancing the Sialumba concession in Zambia’s Southern Province. The programme spans lithium-bearing pegmatites, tin, tantalum, cesium and rubidium, with graphite and additional rare-earth exploration potential.

The development case is being built through geological investigation and process testing. Bench-scale graphite results reported 95.64% fixed-carbon concentrate at 91.3% recovery from a 250-kilogram bulk sample. These results describe laboratory work, not an operating plant.

DOCUMENTED PROGRESS

  • Large-scale mining licence 41481-HQ-LML secured in September 2025.
  • Environmental impact statement approved with conditions on 5 June 2025.
  • Mapping, geophysical surveys, mineralogical work and multi-phase drilling reported.
  • Graphite beneficiation evaluated through bench-scale testwork.
The next phase +
  • Infill and extension drilling to strengthen the geological model.
  • Pre-feasibility work and lithium-cesium-tantalum metallurgy.
  • Evaluate modular processing, infrastructure and prospective offtake arrangements.
Representative 03 / gold / zimbabwe exploration imagery; not a photograph of the named project

03 / GOLD / ZIMBABWE

Shangani.
Follow the geology.

1,911 haReported project area
22Resistivity / IP survey lines
~29 kmReported geophysical profiling

THE PROJECT

The Shangani Gold Project covers a reported 1,911-hectare area in Zimbabwe’s Midlands Province, within the Shangani–Oaklands greenstone domain. Technical materials prepared for Suvarna Mineral Resources identify geological corridors for follow-up exploration.

The project remains at exploration and development stage. Its processing concept is a future design input, while drilling, resource classification and recovery testing will shape the next investment decision.

DOCUMENTED PROGRESS

  • Geological mapping, drone terrain work and aeromagnetic interpretation reported.
  • Surface sampling and geophysical profiling used to prioritise target corridors.
  • Technical report and development concept prepared in August 2025.
The next phase +
  • Confirm targets through systematic drilling and representative assays.
  • Test metallurgical recovery and establish a reviewed resource model.
  • Advance feasibility, permitting and a staged financing plan.

A SECOND GOLD PROGRAMME

Prince Brutus.

Conditional exploration programme

A proposed exploration programme over approximately 500 hectares in Matabeleland South. An April 2025 memorandum between Mining Promotion Corporation and Suvarna Mineral Resources outlines the intended gold-development relationship.

The next phase depends on due diligence, definitive project agreements, approvals and exploration results.

Representative 04 / lithium / zimbabwe exploration imagery; not a photograph of the named project

04 / LITHIUM / ZIMBABWE

Avani.
From outcrop to understanding.

1,640 haExploration area described in the report
28 kmReported geophysical coverage
40Survey profiles

THE PROJECT

Avani Microlight Resources is evaluating pegmatite-hosted lithium mineralisation in Bikita District, Masvingo Province. The draft exploration report describes a 1,640-hectare area and a May–June 2025 campaign combining geological mapping, drone data and ground geophysical surveys.

The immediate objective is to establish grade continuity, mineralogy and processing behaviour. The supplied studies use different estimation bases; those figures require reconciliation before they can support a reliable development case.

DOCUMENTED PROGRESS

  • Field mapping and drone-based terrain interpretation reported.
  • Ground geophysical profiles used to identify priority targets.
  • Follow-up sampling and preliminary drilling described in the June 2025 summary.
The next phase +
  • Systematic drilling and detailed core logging.
  • Laboratory analysis, mineralogical studies and metallurgical testing.
  • Reconcile the geological estimates and commission independent resource review.

THE WORK ALREADY DONE

Progress with
a paper trail.

Licensing, fieldwork and technical preparation form the foundation for the next decisions.

Mineral rights documented

Srimaan’s September 2025 mining licence and Kamiyobo’s June 2026 transfer establish specific project rights and responsibilities.

Ground investigated

Shangani and Avani report mapping and geophysical programmes; Srimaan adds multi-phase drilling and laboratory work.

Processing tested

Srimaan’s graphite bench tests provide sample-level recovery data to inform further process development.

Milestones belong to the named project companies. ALFA participation will be defined through project-specific agreements.

THE DEVELOPMENT ROADMAP

Advance the evidence.
Earn the next step.

01Rights & diligence

Confirm licence tenure, company structure, project boundaries, environmental conditions and transaction responsibilities.

02Geology & resource work

Design representative sampling and drilling, validate assays and build a geological model suitable for independent assessment.

03Processing & feasibility

Test recovery routes, product specification, infrastructure needs, development costs and the commercial case.

04Finance & delivery

Conclude project agreements and approvals, secure funding and progress construction or operations only when the project is ready.

Project sources and status +

Based on the Kamiyobo corporate and technical profile (August 2026); Srimaan Resources project deck (February 2026); Shangani technical report and teaser; MPC–Suvarna memorandum (April 2025); and Avani’s exploration report and June 2025 technical summary.

Project areas, licences and survey results describe the underlying companies and reports. They do not establish mineral reserves, commercial production, ALFA ownership or token collateral. Investment valuations and unreconciled tonnage estimates are excluded from the sector’s headline figures.

Open the source register

PART OF A WIDER ECOSYSTEM

From natural resources
to connected opportunity.

Explore how mining fits alongside aviation, agriculture, healthcare and green energy in the ALFA programme.

Read the mining chapter Connect with ALFA

MINING & NATURAL RESOURCES

Expertise moves projects forward.

Connect with the team on technical, institutional and project-development opportunities.

partnerships@GetALFA.io
↑